Skip to content

CALL US TODAY
01244 661361
mikescott@groundsolve.com

Civil Engineering Contract Administration

2010 Arkwright Street

  • Client:
    Virador
  • Contractor:
    Sonic Drilling Ltd (Sub-Contractor to Costain Ltd)
  • Works Undertaken:
    slope stability runs
    design of soil nails
    production of Contract Drawings & Specification
    production of Designers Health & Safety Risk Register
    review of soil nail test data
    production of as-built drawings

2010 Rhyl WRC

  • Client:
    Denbighshire Country Council
  • Contractor:
    George Brown Consultancy
  • Works Undertaken:
    site investigation including groundwater monitoring and the excavation of boreholes and trial pits
    desk study, provide geotechnical and environmental recommendations
    design of the earth works for the recycling centre and cycle track

2011 Cwrt Dyffryn

  • Client:
    Cartrefi Conwy
  • Works Undertaken:
    site investigation
    desk study
    letter report to provide geotechnical options
    detailed design, drawings and specification for the preferred remedial option

2011 Glaslyn Cottages

  • Client:
    Gwynedd Consultancy
  • Works Undertaken:
    survey of the existing wall
    site investigation
    report providing geotechnical recommendations
    design of remedial works

2012 Froyd Harbour

  • Client:
    Denbighshire County Council
  • Contractor:
    CMP Group Ltd, Dawnus Construction, LM Engineering Service, Martin Wright Associates
  • Works Undertaken:
    site investigation
    desk study
    designing an alternative slip way
    designing a causeway onto Horton’s Nose
    design of a reinforced earth retaining system using CPM blocks
    producing a sheet pile design
    designing the access road and platform for the cranes to install the bridge