Skip to content

CALL US TODAY
01244 661361
mikescott@groundsolve.com

Slope Stabilisation

2007 RML Higham Ferres

  • Client:
    Richards Moorehead and Laing Ltd
  • Works Undertaken:
    ground investigation
    detailed design
    part time site supervision

2008 Kyreside

  • Client:
    Richards Moorehead & Laing Ltd
  • Works Undertaken:
    site investigation
    design calculations
    drawings and specifications for the remedial slope stabilisation works
    designing replacement drainage works

2009 Slab Bridge Cottage

  • Client:
    British Waterways
  • Contractor:
    Condor Projects Ltd (sub-contractor to Morrison Construction)
  • design of anchored retaining walls
    design of the gabion wall
    assessment of revised soil parameters when lacustrine clays were encountered
    design of sheet piles to protect the canal edge

2012 Cefn Mawr

  • Client:
    Richards Moorehead & Laing
  • Contractor:
    Pennine Geotechnical
  • Works Undertaken:
    desk study
    investigation of the ground conditions
    slope stability assessment
    design of remedial works
    assisting Richards Morehead & Laing with the drainage issue

2012 Ysbyty Ifan

  • Client:
    Cartrefi Conwy
  • Contractors:
    C. C. Geotechnical and Earth Engineering
  • Works Undertaken:
    produce a geotechnical report
    desk study
    topographical survey
    obtain and review aerial photography of the area
    site investigationa
    trial pits
    detailed design, drawing & specification of a retaining wall at the crest of the slope

2013 Aberfrwdd Highways Support

  • Client:
    Ceredigion County Council
  • Contractor:
    TSS Wales
  • Works Undertaken:
    slope stability assessment
    design of the anchors
    designers risk assessment
    specifications and drawings for the work

2013 Llanddona Landslide

  • Client:
    Anglesey County Council
  • Works Undertaken:
    site walkover
    stability assessment
    geotechnical recommendations of remedial solutions

2016 Gallows Point

  • Client:
    Ynys Môn County Council
  • Contractor:
    Alun Griffiths (Contractors) Ltd
  • Works Undertaken:
    site investigation to determine the cause of the landslip and the ground conditions
    design of the remedial solution
    preparation of the contract documentation
    preparation of the pre-construction information
    part-time supervision of the construction works