Temporary Works Design
A5 Berwyn Street Culvert, Llangollen
- Client:
Martin Wright Associates (for Denbighshire County Council) - Contractor:
Dawnus Construction Ltd - Works Undertaken:
production of Preliminary Sources Study, Geotechnical Design Report and Geotechnical Feedback Report in accordance with HD22/08
supervision of site investigation
development of the construction method and temporary works with the designer and the Contractor
Baguley Bridge
- Client:
Manchester Metro link - Contractor:
Volker Steel Foundations - Works Undertaken:
site assessment
produce design calculations, drawings and specifications for the works
supervision of the works