Temporary Works Design

A5 Berwyn Street Culvert, Llangollen

  • Client:
    Martin Wright Associates (for Denbighshire County Council)
  • Contractor:
    Dawnus Construction Ltd
  • Works Undertaken:
    production of Preliminary Sources Study, Geotechnical Design Report and Geotechnical Feedback Report in accordance with HD22/08
    supervision of site investigation
    development of the construction method and temporary works with the designer and the Contractor

Baguley Bridge

  • Client:
    Manchester Metro link
  • Contractor:
    Volker Steel Foundations
  • Works Undertaken:
    site assessment
    produce design calculations, drawings and specifications for the works
    supervision of the works